Cricket Square Construction Specification: Quotation for the Construction of a New Cricket Square

General Items to be included in the overall Construction and Maintenance cost.

Item Cost
1. Construction Specification  
Layout  
Excavation of square and setting of levels / gradients  
Consolidated and graded sub-base to cricket square  
Build up of 100mm stone layer  
Build up of 150mm sandy loam layer  
Build up of 120mm clay loam layer  
Gradients and blending in of outfield with 200 tonnes of sandy loam  
Preparation and Seeding of square and outfield:  
Total Construction Cost  
2. Maintenance Specification  
Establish and maintain the Cricket Square  
Establish and maintain the Cricket Outfield  
Total Maintenance Cost  
Total Cost for the Works