Introduction

Whilst this is a period when for most people the pitch is 'out of sight, out of mind', it is a very important period for the groundsman. All the hard work that has been carried out by the renovation of the pitch will need to be maintained and not left to its own devices if a good playing surface is to be achieved for the start of the season.

Irrigation

Once newly sown seed has germinated, it is important to maintain an adequate water supply to the establishing sward. It is important to remember that the grass roots will be mostly young and short at this time and will be gradually extending into the rootzone material. Care will need to be taken to ensure that they do not dry out, yet at the same time you will want to encourage the roots to extend as deeply as possible.

Mowing

This should be on a regular basis to encourage a good sward density to be produced.

Newly germinated and establishing seedlings may be loosely held in the surface layer and may benefit from an initial cut with a rotary mower rather than a cylinder mower to reduce the chance of the grass being pulled out - this may be more prevalent on high sand content pitches than on soil based ones.

The height of cut for professional pitches will be in the region of 25 - 37mm, depending upon how near it is to the first match being played.

Local authority pitches will typically be maintaining their pitches between 37 and 50mm. This higher cut height will also help to retain more ground cover at the start of the season and may be especially important for the limited budgets available to the majority of local authorities.

Pitches with little or no artificial drainage will also benefit from this height of cut, helping them to wear better. Unfortunately the disadvantage of this is that ball bounce and ball roll will be less than at a shorter height of cut. Realistically this should not be too great of a concern as the early part of the season is fairly dry and the benefits will be appreciated later on in the season.

As with many operations, the type of machinery used will depend upon available budgets and the standard of the pitch to be achieved. Professional football pitches may be cut with a pedestrian cylinder mower, whilst local authority pitches will most likely be cut with tractor operated gang mowers.

Rolling

Some pitches, especially sand based ones, may benefit from a light rolling to maintain firm contact between newly germinated grasses and the immediate surface layer.

The rootzone should not be too dry or wet, but with a suitable amount of moisture to help firm the surface. Compacting the surface and subsurface will need to be avoided, otherwise the renovated area will produce a turf that is shallow rooted and easily worn and kicked out when play commences.

Weed Control

If a selective herbicide is to be applied to a pitch, then the grass should be in a strong, growing condition and any areas which have been renovated should not be sprayed too soon after seed germination.

Weed content standards will need to be achieved for the start of the season, so a realistic time for herbicide application is some 6-8 weeks after the renovation work has been completed.

Further Renovation

Some areas may not germinate and establish adequately, including suffering from disease attack or even some form of vandalism and will need to be either reseeded or turfed.

Some settling of top-dressing may also occur, so additional material will need to be made available to ensure an even surface is maintained throughout this period.

Fertiliser Application

A liquid nitrogen fertiliser boost can sometimes be given to aid the establishing sward during this period, but consider how it might impact on the main fertiliser programme when deciding how much nitrogen, or other nutrient/s, to apply. Such a liquid feed given during July can provide for a quick green up of the turf or maintain a suitable greenness until the next fertiliser is applied and can be used to continue to improve the density of the sward.

Just prior to the start of the season, a suitable fertiliser may be applied. The precise nutrient analysis as well as the amount applied will depend upon a number of factors, but primarily upon the type of rootzone present and the fertiliser programme which is being adhered to for the year.

See the Fertiliser section of Part 2 for a suggested yearly programme.

Disease Control

Once the grass seed has germinated and is establishing, then the likelihood of disease attack at this time of year will probably be slim for a perennial ryegrass dominated sward, although the most likely disease will be red thread.

Protecting Establishing Areas

The method, or methods, chosen will depend upon where a pitch is located - in an open parkland situation or enclosed within a stadium.

Methods could include fencing from humans or rabbits, to string or netting to deter bird damage, or even temporarily introducing a bird of prey to scare of bird pests.

Aeration

Surface aeration should continue during this period, although on pitches which have a high soil content or without irrigation, this operation may need to be suspended if the soil is too hard and unpenetrable.

Vertidraining when ground conditions are suitable can still be undertaken, however, consider using the narrower, 12-18mm diameter, tines.

Goal Posts etc.

A week or so before the start of the first match the pitch will be measured and marked out, ensuring all markings are clearly visible from a suitable distance and to the correct dimensions.

Post sockets will need to be either cleared out or reinstalled beforehand.

Uprights, crossbars and corner posts should be in a well painted condition, whilst nets and flags should also be in an undamaged and tidy condition.