Football Pitch Maintenance: Interactive Yearly Workload Estimator


This workload estimator is a useful modelling tool to help determine the likely input required to maintain a football pitch to a required standard (see Performance Quality Standards). The actual inputs will depend upon a number of factors, including the carrying capacity of the pitch and the anticipated usage.

Changes to inputs can be easily undertaken to see the impact this will have on the total hours for maintaining a pitch. This is ideal for 'what if' scenarios.

The results can then be readily converted into staff costs for the maintenance of a pitch.

The experience of the main person responsible for maintaining a pitch will be invaluable in helping to determine the maintenance input required, as this person will be the one who has the local knowledge on the existing soil conditions and the effect the local weather has on both its playability and suitability for maintenance tasks.

Some general times to complete each task based on a pitch of 6,000 m²; however, these can be simply overwritten, if desired, for your own purposes.

Note. Do not add a leading zero, i.e. 0, to any whole numbers, i.e. 5 should not be represented as 05, otherwise erroneous results will be produced. Follow this simple rule and your own detailed work estimator will give you the answer you are looking for.

Three Miscellaneous boxes have been included to allow for any specific requirements not covered in the rest of the table.

Total (projected) number of occasions the task is to be carried out PER YEAR Average time, in HOURS, to complete each task.
Mow @ 35-50mm (e.g.)
Mow @ 25-35mm (e.g.)
Initial Mark Out
Overmark Pitch
Aerate - Slit/Chisel tine
Aerate - Deep spike
Top-dress & work-in: 40 tonnes
Overseed
Additional renovation
Maintain evenness
Occasional divoting
Fertilise
Roll
Scarify
Chain harrow / drag brush
Irrigate pitch
Selective herbicide application
Fungicide application
Other pesticide application
Erect goal posts
Dismantle goal posts
Paint goal posts
Miscellaneous 1
Miscellaneous 2
Miscellaneous 3
Total staff hours